Day 1 of Grand River’s installation schedule yielded significant progress on the balcony. The main piece and frame was affixed to the building and several additional pieces were attached. They worked in 96+ degree heat throughout the day.
Historical Information and Restoration Progress of 120 & 124 South Winter St – Downtown Adrian, Michigan
Day 1 of Grand River’s installation schedule yielded significant progress on the balcony. The main piece and frame was affixed to the building and several additional pieces were attached. They worked in 96+ degree heat throughout the day.