After trying about half a dozen chemical stripping products, we settled on one that seemed to work — but it was clear that it would take multiple applications. Sure enough, between 3 and 6 applications on every square inch of the entire 70′ x 30′ south façade was required in order to get to a relatively uniform red color. The process took nearly 3 months.